INSPECTION AND TESTING OF EQUIPMENTS

Inspection and testing of the purchased equipment is one of the most important tasks in the engineering of a project. Its importance is sometimes underestimated. The first serious tests that the purchaser will witness are those in the factory where the equipment is assembled. These tests will also include a physical inspection of the equipment.

It is therefore important to state clearly in the specification what inspection and testing will be required and, where appropriate, what are the acceptable limits of the results. Most tests required in the oil industry are covered in international specifications and these can be used as references.

However, not all those in the reference documents need to be carried out in all cases. It is therefore prudent to state the requirements in the project specification in one or more of the following methods:

• Write a detailed description of exactly what is required, including the limits that are acceptable and the form in which the results should be reported. This method ensures a ‘self-contained’ approach that is very beneficial during the actual testing operation. Often time is limited to perform tests and to have all the requirements to hand without having to search through related documents enables the work to be completed very efficiently.

• Quote the exact clause numbers and sub-section headings in the reference documents for the particular tests to be performed. This may be less efficient when the time of the tests becomes due, especially if the reference documents are not easily to hand. If a statement is made such as ‘the switch gear shall be tested in accordance with the XYZ-123 international standard’ and no other clarification is included, then many debates can arise at the time of testing.

Whichever method is used it should be carefully checked by a quality assurance department before the specification is approved for purchasing the equipment.

Some types of equipment require ‘production tests’, ‘type tests’, ‘performance tests’, ‘routine tests’, ‘abbreviated tests’ or ‘special tests’, or a combination of these tests. The subtitles are sometimes used with different meanings. Production tests are required for complex equipment such as high voltage generators and motors, and these tests are performed in the factory before the complete unit is assembled. For example the rotors are balanced without the stator, air-to-water heat exchanges can be tested to withstand hydraulic pressure, winding insulation and individual coil insulation can be tested.

Type tests are performed on one from a group of identical units. These tests are comprehensive and some of which are usually only performed once in the life span of the equipment.

If the equipment is a standard product of the manufacturer for which existing certificates can show that a type test has previously been carried out, then the purchaser may wish to accept the certificate without repeating the test. This is largely a matter of choice than necessity.

Routine and abbreviated tests are generally the same form of tests. These are applied to those units in a group that have not been type tested. If only one unit is to be purchased and a type test has been waived then a routine test is usually performed and the results compared to those of a previous type test. The number of different tests included in the routine tests is less than that of the type tests.

Some of the tests may be identical in each category. Routine tests are usually witnessed by the owner or purchaser.

Performance tests are those tests that need to be carried out on combined equipment such as a gas-turbine driven generator or a pump driven by a high-voltage motor. In such cases the dynamic relationship between the various equipment's is of interest. For example, rotor vibration, critical speeds, run-up time to full speed, starting up and shutting down sequences, full-load and over-load performances, heat dissipation and cooling medium performance. Occasionally ‘special tests’ may be required. These may be due to the need to operate the unit in an unusual mode or to test special control systems that may involve associated equipment such as a power management system or a control panel. Special tests may be needed to verify the operation of protective devices in the equipment rather than the equipment itself, but which require the device to be in its fully functional position on its host equipment. The owner or the purchaser usually witnesses performance and special tests.

Routine tests usually include a thorough inspection of the equipment both before and after the testing is complete. Routine testing should not be confused with sample testing. For example a switchboard may consist of many panels of essentially the same type, e.g. motor starters, transformer feeders. The testing schedule should state whether samples of similar types could be tested in lieu of testing all the units. In either case a full routine test is generally required. Functional testing of mechanical operation should be applied to all the units, e.g. open and close contactors, rack in and out circuit breakers, operate switches and controls.

Comments

Popular posts from this blog

PRIMARY SECONDARY AND TERTIARY FREQUENCY CONTROL IN POWER SYSTEMS

Primary, Secondary and Tertiary Frequency Control in Power Systems Author: Engr. Aneel Kumar Keywords: frequency control, primary frequency control, automatic generation control (AGC), tertiary control, load-frequency control, grid stability. Frequency control keeps the power grid stable by balancing generation and load. When generation and demand drift apart, system frequency moves away from its nominal value (50 or 60 Hz). Grids rely on three hierarchical control layers — Primary , Secondary (AGC), and Tertiary — to arrest frequency deviation, restore the set-point and optimize generation dispatch. Related: Power System Stability — causes & mitigation Overview of primary, secondary and tertiary frequency control in power systems. ⚡ Primary Frequency Control (Droop Control) Primary control is a fast, local response implemented by generator governors (dro...

Breaker Schemes in Substations

Breaker Schemes in Substations — Types, Design, Advantages, Disadvantages, and Comparison Author: Engr. Aneel Kumar Figure 1: Infographic overview of breaker schemes commonly used in substations. Introduction The breaker scheme or busbar arrangement in a substation defines how incoming feeders, outgoing feeders, and power transformers are connected to the bus. The choice of scheme has a direct impact on system reliability, maintainability, safety, and cost . A simple bus scheme is economical but vulnerable to outages, while advanced schemes such as breaker-and-a-half or double-bus/double-breaker provide very high reliability but at much higher cost and design complexity. Engineers select breaker schemes considering fault tolerance, maintenance needs, space requirements, expansion possibilities, protection coordination, and capital investment . Below, we explain eac...

SYMMETRICAL COMPONENT ANALYSIS

Unbalanced three phase systems can be split into three balanced components, namely Positive Sequence (balanced and having the same phase sequence as the unbalanced supply), Negative Sequence (balanced and having the opposite phase sequence to the unbalanced supply) and Zero Sequence (balanced but having the same phase and hence no phase sequence). These are known as the Symmetrical Components or the Sequence Components and are shown in figure 2.10. The phase components are the addition of the symmetrical components and can be written as follows.  a = a 1 + a 2 + a 0 b = b 1 + b 2 + b 0 c = c 1 + c 2 + c 0 The unknown unbalanced system has three unknown magnitudes and three unknown angles with respect to the reference direction. Similarly, the combination of the 3 sequence components will also have three unknown magnitudes and three unknown angles with respect to the reference direction. Thus the original unbalanced system effectively has 3 complex unknown quan...

TYPES OF ELECTRIC LOADS

Devices that are connected to the power system are referred to as electrical loads. Toasters, refrigerators, bug zappers, and so on are considered electrical loads. There are three types of electrical loads. They vary according to their leading or lagging time relationship between voltage and current. The three load types are resistive, inductive, and capacitive. Each type has specific characteristics that make them unique. Understanding the differences between these load types will help explain how power systems can operate efficiently. Power system engineers, system operators, maintenance personnel, and others try to maximize system efficiency on a continuous basis by having a good understanding of the three types of loads. They understand how having them work together can minimize system losses, provide additional equipment capacity, and maximize system reliability. The three different types of load are summarized below. 1) RESISTIVE LOAD: The resistance in a wire (i.e., cond...

SOLIDLY GROUNDED NEUTRAL SYSTEMS

Solidly grounded systems are usually used in low voltage applications at 600 volts or less. In solidly grounded system, the neutral point is connected to earth. Solidly Neutral Grounding slightly reduces the problem of transient over voltages found on the ungrounded system and provided path for the ground fault current is in the range of 25 to 100% of the system three phase fault current.. However, if the reactance of the generator or transformer is too great, the problem of transient over voltages will not be solved. While solidly grounded systems are an improvement over ungrounded systems, and speed up the location of faults, they lack the current limiting ability of resistance grounding and the extra protection this provides. To maintain systems health and safe, Transformer neutral is grounded and grounding conductor must be extend from the source to the furthest point of the system within the same raceway or conduit. Its purpose is to maintain very low impedance to ground faults so...

ESSENTIAL ELEMENTS OF DIESEL POWER PLANT

FUEL SUPPLY SYSTEM OF DIESEL POWER PLANT It consists of storage tank, strainers, fuel transfer pump and all day fuel tanks. The fuel oil is supplied at the plant site by rail or road. The oil is stored in the storage tank. From the storage tank, oil is pumped to smaller all day tank at daily or short intervals. From this tank, fuel oil is passed through strainers to remove suspended impurities. The clean oil is injected into the engine by fuel injection pump. AIR INTAKE SYSTEM OF DIESEL POWER PLANT This system supplies necessary air to the engine for fuel combustion. It consists of pipes for the supply of fresh air to the engine manifold. Filters are provided to remove dust particles from air which may act as abrasive in the engine cylinder. Because a diesel engine requires close tolerances to achieve its compression ratio, and because most diesel engines are either turbocharged or supercharged, the air entering the engine must be clean, free of debris, and as cool as possible. ...

ADVANTAGES AND DISADVANTAGES OF CORONA EFFECT IN TRANSMISSION LINES | ELECTRICAL ENGINEERING GUIDE

Advantages and Disadvantages of Corona Effect in Power Systems In high-voltage overhead transmission lines , the corona effect plays a critical role in system performance. Corona occurs when the air around a conductor becomes ionized due to high electric stress. While often seen as a drawback because of power losses and interference , it also provides certain engineering benefits . This article explains the advantages and disadvantages of corona effect in detail, with examples relevant to modern electrical power systems. ✅ Advantages of Corona Effect Increase in Virtual Conductor Diameter Due to corona formation, the surrounding air becomes partially conductive, increasing the virtual diameter of the conductor. This reduces electrostatic stress between conductors and minimizes insulation breakdown risks. Related Reading: Electrostatic Fields in High Voltage Engineering Reduction of Transient Surges Corona acts like a natural cushion for sudden ...