Skip to main content

CORRECT DIRECTION/ PLACE OF SOLAR PANEL

A well-designed solar electric system has clear and unobstructed access to the sun for most of the day throughout the year. Siting a PV system correctly is critical in order to achieve maximum power production and thus maximum energy offset and financial return.

Orientation and Tilt

Optimal orientation for solar panels is true south. As you move away from true south, a system will suffer production losses, up to as much as 15–25% for panels oriented east or west. However with advancements in technology these losses are decreasing as inverter manufacturers learn how to maximize off-of-south orientations. In Seattle, solar panels produce the maximum power annually when mounted at a tilt of roughly 30 degrees.

Shading

Avoid shading as much as possible. Even minimal shading can significantly impact power production. You will want to consider potential shading from trees, buildings, power lines, telephone poles, and obstructions like chimneys and vent pipes. Your contractor should include the impact of obstructions on your power production estimate.

Sloped Roof

A significant portion of your system cost will be in the installation of the panels, so if you plan on replacing your roof in the next 5–7 years, consider doing that first. Otherwise, your installer will need to come back to remove the panels for the new roofing to be added, and then re-install the panels all at your cost. Overall, you want to be sure your roof is in excellent long-term condition, because PV systems are designed to last a minimum of 20 years and many will last even longer. So, if you are unsure about the structural integrity of your roof, have it professionally inspected to verify its condition and suitability.

Flat Roof

Most residential and small commercial PV systems are installed on sloped roofs, yet it is possible to install on a flat roof. Contractors typically avoid penetrating a flat roof and instead use some sort of ballasted (weighted) means of securing the panels against wind. Building code officials will be concerned about the wind sheer and roof loading of such a system. If a flat roof system is in your future, plan to submit a professional engineer (PE) stamped drawing illustrating how the system will be secured to the building.

Tracking

Most residential and commercial PV installations are mounted to roofs and are fixed in place. If your system is going to be mounted on a pole or a flat roof, you have the choice of installing a tracking device. The simplest form of tracking is to seasonally adjust the tilt angle of the panels. Automatic tracking devices allow the panels to follow the sun as it moves through the sky, receiving direct light more often than a fixed system. Electrically operated and thermally operated trackers have their own costs, benefits, and drawbacks. Keep in mind that without a tracker, your PV system has no moving parts. While automatic trackers can increase production by 20–40%, they do add moving parts to the system, so there are operation and maintenance concerns to consider. Pole-mounted systems also have the additional cost of the pole installation.

Comments

Popular posts from this blog

Breaker Schemes in Substations

Breaker Schemes in Substations — Types, Design, Advantages, Disadvantages, and Comparison Author: Engr. Aneel Kumar Figure 1: Infographic overview of breaker schemes commonly used in substations. Introduction The breaker scheme or busbar arrangement in a substation defines how incoming feeders, outgoing feeders, and power transformers are connected to the bus. The choice of scheme has a direct impact on system reliability, maintainability, safety, and cost . A simple bus scheme is economical but vulnerable to outages, while advanced schemes such as breaker-and-a-half or double-bus/double-breaker provide very high reliability but at much higher cost and design complexity. Engineers select breaker schemes considering fault tolerance, maintenance needs, space requirements, expansion possibilities, protection coordination, and capital investment . Below, we explain eac...

PRIMARY SECONDARY AND TERTIARY FREQUENCY CONTROL IN POWER SYSTEMS

Primary, Secondary and Tertiary Frequency Control in Power Systems Author: Engr. Aneel Kumar Keywords: frequency control, primary frequency control, automatic generation control (AGC), tertiary control, load-frequency control, grid stability. Frequency control keeps the power grid stable by balancing generation and load. When generation and demand drift apart, system frequency moves away from its nominal value (50 or 60 Hz). Grids rely on three hierarchical control layers — Primary , Secondary (AGC), and Tertiary — to arrest frequency deviation, restore the set-point and optimize generation dispatch. Related: Power System Stability — causes & mitigation Overview of primary, secondary and tertiary frequency control in power systems. ⚡ Primary Frequency Control (Droop Control) Primary control is a fast, local response implemented by generator governors (dro...

AC Transmission Line and Reactive Power Compensation: A Detailed Overview

  Introduction The efficient operation of modern power systems depends significantly on the management of AC transmission lines and reactive power. Reactive power compensation is a vital technique for maintaining voltage stability, improving power transfer capability, and reducing system losses. This article explores the principles of AC transmission lines, the need for reactive power compensation, and its benefits in power systems. Keywords: Reactive Power Compensation Benefits, STATCOM vs SVC Efficiency, Power Transmission Stability Solutions, Voltage Stability in Long-Distance Grids, Dynamic Reactive Power Compensation.      Fundamentals of AC Transmission Lines AC transmission lines are the backbone of modern power systems, connecting generation stations to distribution networks. They have distributed electrical parameters such as resistance ( R R R ), inductance ( L L ), capacitance ( C C ), and conductance ( G G ) along their length. These parameters influence ...

Operation of Thyristor Controlled Series Capacitor (TCSC): Mechanism and Working Principles

Introduction In modern power systems, maintaining voltage stability and optimizing power transmission is crucial. One of the most effective FACTS (Flexible AC Transmission System) controllers for this purpose is the Thyristor Controlled Series Capacitor (TCSC) . TCSC dynamically adjusts line impedance , allowing for enhanced power flow, transient stability improvement, and subsynchronous resonance (SSR) mitigation . Unlike conventional fixed series capacitors, TCSC uses thyristor-controlled switching to regulate the compensation level in real-time, ensuring grid reliability and efficiency . In this article, we will explore: ✅ The working principle and internal structure of TCSC ✅ Modes of operation and impedance control mechanisms ✅ How TCSC enhances power system efficiency and stability Understanding the Thyristor Controlled Series Capacitor (TCSC) What is a TCSC? A Thyristor Controlled Series Capacitor (TCSC) is a power electronic-based controller used in transmission systems to ...

Advantages of Per Unit System in Power System Analysis | Electrical Engineering

  Advantages of Per Unit System in Power System Analysis In electrical power engineering, the per unit (p.u.) system is one of the most widely used techniques for analyzing and modeling power systems. It is a method of expressing electrical quantities — such as voltage, current, power, and impedance — as fractions of chosen base values rather than their actual numerical magnitudes. This normalization technique provides a universal language for system calculations, minimizing errors, simplifying transformer modeling, and enabling consistency across multiple voltage levels. Because of these benefits, the per unit system is essential in fault analysis, load flow studies, transformer testing, and short-circuit calculations . ⚡ What is the Per Unit System? The per unit system is defined as: Q u a n t i t y ( p u ) = A c t u a l   V a l u e B a s e   V a l u e Quantity_{(pu)} = \dfrac{Actual \ Value}{Base \ Value} Q u an t i t y ( p u ) ​ = B a se   ...

REVERSING DIRECTION OF ROTATION OF UNIVERSAL MOTOR

The direction of rotation of a universal motor can be changed by either: (i) Reversing the field connection with respect to those of armature; or (ii) By using two field windings wound on the core in opposite directions so that the one connected in series with armature gives clockwise rotation, while the other in series with the armature gives counterclockwise rotation. The second method, i.e, the two field method is used in applications such as motor operated rheostats and servo systems. This method has somewhat simpler connections than the first method. For simple applications like portable drills etc. manual switches are frequently used for reversing the direction of rotation of the motor. Figure  1 (a and b) shows how a DPDT (Double Pole Double Throw) switch and a three position switch may be used for reversing the direction of rotation of single field and double field type of motors respectively. Figure 1 Reversing of a universal motor (a) Armature re...

Types of Transmission Towers in Saudi Electricity Company (SEC) – NGSA Standards

 The Kingdom of Saudi Arabia (KSA) is rapidly expanding its energy infrastructure projects to meet the growing demand for electricity. At the heart of this growth lies the high voltage transmission network , which delivers reliable power from generation plants to cities, industries, and remote areas. To ensure safety and efficiency, the Saudi Electricity Company (SEC) follows strict NGSA (National Grid Saudi Arabia) standards for designing and selecting transmission towers . These lattice steel towers are engineered to withstand extreme desert conditions, high wind loads, and long transmission spans. In this article, we will explore the different types of transmission towers in Saudi Arabia , their applications, and how they contribute to the power transmission system design . Why Transmission Towers Are Crucial in Power Grid Development Every kilometer of transmission line construction requires careful planning. The right tower design ensures: Stable support for 69k...