CAUSES OF ELECTRICAL POWER OUTAGES

Interruptions in the supply of electricity to customers can occur at any hour of the day or night and can last from fractions of a second to many hours or even days. Interruptions can be caused by disturbances to or malfunctions of any of the three components of the power system: generation, transmission, or distribution. They can also be caused by the unavailability of adequate resources to supply the customer load. These two attributes of reliability are characterized by NERC as security and adequacy.

Data shows that over 90% of customer outages are caused by problems originating on the local distribution system. Although generation and transmission-related outages are less common than those related to the distribution system, they often have much more serious consequences because of the number of customers affected and the duration of the outage.



Disturbances can be initiated by:

1) External events such as:
  • Environmental factors, including wind, rain, lightening, ice, fire, floods, and earthquakes
  • Accidents such as cars hitting poles
  • Sabotage (sadly)
2) Internal events such as
  • Insufficient resources
  • Failure of equipment due to electrical or mechanical stresses
  • Operating errors or decisions
Lack of resources can be due to:

1) Insufficient generation caused by
  • Low load forecasts
  • Shortages of fuel due to supply disruptions or delivery/transportation problems
  • Opposition to the construction of required new generating capacity
  • Failure of equipment due to electrical or mechanical stresses poor planning
  • Excessive maintenance outages
  • Regulatory actions restricting the operation of power plants
  • Transmission constraints
  • Generation being retired because it is noncompetitive in the new competitive market
2) Insufficient transmission or distribution caused by:
  • Low load forecasts
  • Opposition to the construction of required new transmission or distribution lines
  • Failure of equipment due to electrical or mechanical stresses
  • Poor planning
  • Intentional outages required because of other infrastructure work, such as the widening of roads
The duration of the interruption will be affected by the severity of the disturbance, the power system facilities affected, the redundancy or reserve built into the system, and the preparedness of the involved operating entities to respond. Some interruptions are of very short duration because the disturbance is transient and the system self-corrects. Some interruptions, such as those caused by tornadoes or ice storms, damage significant portions of the system, requiring many days to restore service. When there are insufficient generation resources, the outages may be of a controlled and rotating nature. Their duration might be only during peak load hours.

The extent of the interruption will be determined by the initiating disturbances and the facilities affected. For example, cascading outages caused by a fault occurring when a system is operating above a safe level can involve many states, as can a widespread ice storm. Conversely, a distribution pole damaged by a car may affect only a few homes.

An increasingly important aspect of power system reliability is the quality of service or power quality. With the increasing importance of computers and new electronic communication procedures, imperfections in electric service become increasingly important to the customer. Such imperfections include:
  • Momentary interruptions
  • Voltages outside of acceptable limits
  • Voltage dips of very short duration
Protection against power quality imperfections can often be handled by the consumer. Pressure is mounting, however, for the supplier to improve quality. This raises the question of the responsibility for such improvements in a deregulated power industry with separate companies providing distribution, transmission, and power supply services

Comments

Popular posts from this blog

PRIMARY SECONDARY AND TERTIARY FREQUENCY CONTROL IN POWER SYSTEMS

Primary, Secondary and Tertiary Frequency Control in Power Systems Author: Engr. Aneel Kumar Keywords: frequency control, primary frequency control, automatic generation control (AGC), tertiary control, load-frequency control, grid stability. Frequency control keeps the power grid stable by balancing generation and load. When generation and demand drift apart, system frequency moves away from its nominal value (50 or 60 Hz). Grids rely on three hierarchical control layers — Primary , Secondary (AGC), and Tertiary — to arrest frequency deviation, restore the set-point and optimize generation dispatch. Related: Power System Stability — causes & mitigation Overview of primary, secondary and tertiary frequency control in power systems. ⚡ Primary Frequency Control (Droop Control) Primary control is a fast, local response implemented by generator governors (dro...

ADVANTAGES AND DISADVANTAGES OF CORONA EFFECT IN TRANSMISSION LINES | ELECTRICAL ENGINEERING GUIDE

Advantages and Disadvantages of Corona Effect in Power Systems In high-voltage overhead transmission lines , the corona effect plays a critical role in system performance. Corona occurs when the air around a conductor becomes ionized due to high electric stress. While often seen as a drawback because of power losses and interference , it also provides certain engineering benefits . This article explains the advantages and disadvantages of corona effect in detail, with examples relevant to modern electrical power systems. ✅ Advantages of Corona Effect Increase in Virtual Conductor Diameter Due to corona formation, the surrounding air becomes partially conductive, increasing the virtual diameter of the conductor. This reduces electrostatic stress between conductors and minimizes insulation breakdown risks. Related Reading: Electrostatic Fields in High Voltage Engineering Reduction of Transient Surges Corona acts like a natural cushion for sudden ...

CASCADED TRANSFORMERS METHOD FOR GENERATING AC HIGH VOLTAGE

High-Frequency AC High Voltage Generation Using Cascaded Transformers Author: Engr. Aneel Kumar Figure 1: Infographic representation of cascaded transformers method for generating high AC voltages. Introduction In high voltage engineering , generating very high alternating current (AC) voltages is essential for testing equipment like insulators, circuit breakers, power cables, and other apparatus. One common and effective method for producing such voltages is the cascaded transformers method . This technique uses a series connection of specially designed test transformers , where the secondary of one transformer feeds the primary of the next. In this way, voltages are built up step by step, achieving levels in the range of hundreds of kilovolts (kV) or even megavolts (MV). Working Principle The principle of cascaded connection relies on the fact that each...

Breaker Schemes in Substations

Breaker Schemes in Substations — Types, Design, Advantages, Disadvantages, and Comparison Author: Engr. Aneel Kumar Figure 1: Infographic overview of breaker schemes commonly used in substations. Introduction The breaker scheme or busbar arrangement in a substation defines how incoming feeders, outgoing feeders, and power transformers are connected to the bus. The choice of scheme has a direct impact on system reliability, maintainability, safety, and cost . A simple bus scheme is economical but vulnerable to outages, while advanced schemes such as breaker-and-a-half or double-bus/double-breaker provide very high reliability but at much higher cost and design complexity. Engineers select breaker schemes considering fault tolerance, maintenance needs, space requirements, expansion possibilities, protection coordination, and capital investment . Below, we explain eac...

Advantages of Per Unit System in Power System Analysis | Electrical Engineering

  Advantages of Per Unit System in Power System Analysis In electrical power engineering, the per unit (p.u.) system is one of the most widely used techniques for analyzing and modeling power systems. It is a method of expressing electrical quantities — such as voltage, current, power, and impedance — as fractions of chosen base values rather than their actual numerical magnitudes. This normalization technique provides a universal language for system calculations, minimizing errors, simplifying transformer modeling, and enabling consistency across multiple voltage levels. Because of these benefits, the per unit system is essential in fault analysis, load flow studies, transformer testing, and short-circuit calculations . ⚡ What is the Per Unit System? The per unit system is defined as: Q u a n t i t y ( p u ) = A c t u a l   V a l u e B a s e   V a l u e Quantity_{(pu)} = \dfrac{Actual \ Value}{Base \ Value} Q u an t i t y ( p u ) ​ = B a se   ...

SYMMETRICAL COMPONENT ANALYSIS

Unbalanced three phase systems can be split into three balanced components, namely Positive Sequence (balanced and having the same phase sequence as the unbalanced supply), Negative Sequence (balanced and having the opposite phase sequence to the unbalanced supply) and Zero Sequence (balanced but having the same phase and hence no phase sequence). These are known as the Symmetrical Components or the Sequence Components and are shown in figure 2.10. The phase components are the addition of the symmetrical components and can be written as follows.  a = a 1 + a 2 + a 0 b = b 1 + b 2 + b 0 c = c 1 + c 2 + c 0 The unknown unbalanced system has three unknown magnitudes and three unknown angles with respect to the reference direction. Similarly, the combination of the 3 sequence components will also have three unknown magnitudes and three unknown angles with respect to the reference direction. Thus the original unbalanced system effectively has 3 complex unknown quan...

Comprehensive Guide to Static Var Compensators (SVC): Mechanisms, Configurations, and Applications

  Introduction In modern power systems, voltage stability and reactive power management are critical for ensuring efficient and reliable operation. Static Var Compensators (SVCs), a key component of Flexible AC Transmission Systems (FACTS), address these challenges by dynamically controlling reactive power in AC transmission networks. This article explores SVCs in-depth, including their mechanisms, configurations, applications, and impact on power systems. Keywords: Static Var Compensator Applications, SVC Voltage Regulation Systems, Reactive Power Management Solutions, Harmonic-Free Power Systems, Dynamic Voltage Stabilization Technologies. Understanding Static Var Compensators (SVC) What is an SVC? A Static Var Compensator is a shunt-connected device used to regulate voltage by controlling reactive power in AC systems. Unlike traditional solutions like synchronous condensers, SVCs leverage power electronics for faster and more precise responses to voltage fluctuations. How SVC Wo...